LARGE COMMERCIAL - SCHEDULE LGE

SYSTEM CHARGE.........................................................................................$75.00/MO

On all Large Commercial Installations of 50 KVA and over 

PLUS A DEMAND OF.....................................................................................$15.00/KW of Demand

PLUS AN ENERGY CHARGE........................................................................ $0.0775/KWH

MINIMUM CHARGE

Minimum charge shall be................................................................................$75.00 plus the Contracted Demand x $15.00

Power Factor should be maintained as near utility as practicable.

The measured KW demand shall be increased 1% for every percent the measured Power Factor falls under 95%.

MINIMUM BILLING PERIOD CHARGES*

The minimum charges per billing period shall be the highest of the following:

Minimum charges established in accordance with Line Extension Policy.  (No Power allowed for the first $75.00)

Or

$1.20/ KV of installed transformer capacity plus $75.00 system charge. (No power allowed for the first $75.00)  Demand and energy allowances shall be made only during the billing period in which they occurred

Or

Minimum charges established by special contract between the consumer and the Utility.  This charge shall be in the addition to the system charge of $75.00  (no KWH or KW allowance in system charge).

 